• Water Infrastructure: o Installing 9,900 LF of 4”, 6”, 8”, and 12” water main and appurtenances. o Installing 300 water service change overs with 85 being via trenchless means. o Installing 300 water meter and box replacements. o Abandoning 19,050 LF of existing 1.5”, 2”, 6”, and 8” water main. o Removal and disposal of 1,575 LF of 1.5” and 6” water main. • Wastewater Infrastructure: o Installing 3,750 LF of 8” gravity sewer main and 18 manholes. o Installing 105 sewer lateral service replacements with 3 being via trenchless means. o Installing 195 LF of sewer lateral adjustment adjacent to CSXT ROW o Installing 533 LF of sewer lateral re-routing o Installing 2,250 LF of sanitary sewer lateral service CIPP lining o Removal and disposal of 3,275 LF of 6” and 8” gravity sewer and 11 manholes • Storm Drainage Infrastructure o Installing 725 LF of 12”, 15”, 18”, and 24” storm pipe and 17 storm structures. o Removal and disposal of 725 LF of 12”, 15”, 18”, and 24” storm pipe and 17 storm structures. • Miscellaneous o Installing appropriate E&S measures. o Installing 43,340 SY of 2-inch asphalt roadway milling and overlay. o Installing 9,995 SY of full depth asphalt pavement repair. o Removal and replacement of 11,890 SY of Asphalt pavement. o Removal and replacement of 190 LF of Granite Curb to Wake Forest Historic District Standard. o Removal, replacement, and installation of 76 concrete curb ramps to ADA compliance. o All associated efforts to return the site to pre-construction conditions.