The work in this Contract consists of, but not limited to, the following: Installation of approximately 240 LF of 18-inch RCP storm sewer, four new drainage structures, VCP abandonment, pavement repair, and other appurtenances associated with the relocation of storm sewer near 306 S. Elam Street; Installation of approximately 251 LF of 42”HDPE pipe, a 9’x10’ junction box, pavement repair, and other appurtenances associated with installation of storm sewer near 7305 Old Friendly Road; Installation of approximately 345 LF of 18” RCP storm sewer, five new drainage structures, VCP abandonment, pavement repair, and other appurtenances associated with the relocation of storm sewer near 720 Percy Street; and Installation of approximately 45 LF of Triple 18”x11” arch pipe, approximately 130 LF of 30” RCP, approximately 11 LF of 15” RCP, approximately 20 LF of 12” RCP, 7 structures, utility relocation, pavement repair, Truck dock removal and replacement, and other appurtenances associated with the relocation of storm sewer near 625 Fulton Street.