1. The requested service is a Point-to-Point service between the User Network Interface (UNI) at the Owner’s “Collector Site” to the UNI(s) located at each of the sites as listed on “Attachment A – Site Schedules Option 1 and Option 2”. The Owner has provided two (2) options for requested service, please provide a separate price for each option listed on the Attachment “A” Schedules Option 1 and Option 2. 2. The Connections shall be a minimum of 1Gbps, or higher, unless otherwise noted on the “Attachment A – Site Schedules Option 1 and Option 2”. 3. The Respondent will provide a separate price for all one-time special construction and/or build-out costs, including but not limited to: conduit/trenching, interior pathways, cabling, terminations, construction of network facilities, route assessments, ROW access and/or easement assessments, traffic control and permits, surveys, testing, design and engineering, and project management to provide the requested service connection to the Owner’s designated demarcation point and also a separate proposal to amortize the cost of the construction into the monthly contract cost. The cost of one-time construction and/or installation fees as necessary by the bidder to provide their proposed service. For ERate purposes, special construction refers to the upfront, non-recurring costs associated with the installation of new fiber to or between eligible entities. If no new fiber is being installed, then any installation costs are considered standard, non-recurring costs (NRC). The Owner may seek funding for special construction charges relating to leased lit, leased dark and selfprovisioned fiber. Special construction charges eligible for Category One support consist of three components: a. Construction and network facilities b. Design and Engineering c. Project Management