2.2.6 Debris. The Contractor shall clean work areas daily, at the end of the workday, of all work-generated debris which may endanger the safety of the others (the public; Agency residents; etc.). 2.2.6.1 All work areas must be kept sanitary and clean of any trash. Debris from work must be removed from living areas. 2.2.6.2 The Contractor must examine the work area and determine any unsuitable work condition. 2.2.6.3 Any required removal or replacement of this work caused by unsuitable conditions will be just cause for the Contractor to bear the expense. Notice of unsuitable conditions shall be brought to the Agency’s representative in written form. 2.2.6.4 The Contractor shall provide a construction dumpster as needed to dispose and removal all debris. The use of the Agency dumpsters is prohibited. 2.2.7 Delivery of Materials. The Contractor and each Subcontractor shall inspect the site and determine the availability of storage space and trucking facilities to bring material or equipment into the building, or any other factors affecting the work under this Contract. 2.2.7.1 Long lead items should be ordered as soon as possible, after contracts are signed, to expedite shop drawings and delivery of materials to site. Advance planning will be important to ensure timely delivery of materials. 2.2.8 Final Inspection and Punch List. The Agency shall provide one (1) final inspection site visit to develop the final Punch List when the following are completed: 2.2.8.1 All new construction and installations are 100% complete and operational. 2.2.8.2 A test and balance report has been completed and delivered to the Agency for review. 2.2.8.3 All final inspections and permits have been closed and delivered to the Agency. 2.2.8.4 When the Contractor has completed all work, and feels substantial completion has been achieved, the Contractor must document and request a final inspection and punch list be performed by the Agency. This will document the one (1) final inspection and punch list by the Agency. 2.2.8.5 When the Contractor has completed all the punch list items, the Contractor shall document and request a final re-inspection by the Agency. 2.2.8.6 The Agency will provide a one (1) final site visit for reinspection of the punch list items. 2.2.8.7 If the Agency feels the punch list items have not been completed satisfactorily, notice will be given to the Contractor. 2.2.8.8 All punch list items must be completed at the time of substantial and final acceptance. 2.2.8.9 If the final punch list items are not complete at the time of the final the retainage will be withheld until final acceptance by the Agency.