2.1 Remove all coatings on exterior concrete walls of the Administration Main Building at the Northwest Water Treatment Plant down to the concrete surface other than minor areas identified by staff. 2.2 No portions of the walls coated with an Exterior Insulation and Finish System (EIFS) shall be disturbed. 2.3 The coating shall be removed from the interior coating limit on the top of the wall to the bottom where it interfaces with the ground. 2.4 Coatings on the top of the wall and on interior walls shall not be disturbed. 2.5 The work includes the cost of all mobilization, overhead, insurance, clean up, and all ancillaries necessary for a complete service. 2.6 No debris will be left at the site or allowed to enter portions of the treatment works. 2.7 Debris disposal costs must be included in the submitted proposal. 2.8 All necessary permits for the work are the responsibility of the contractor. 2.9 Contractor shall attend a meeting with County staff to determine setup, staging area, storage, and appropriate work hours prior to commencing services under the awarded contract. Contractor shall provide portable toilets for staff and contractors unless Brunswick County facilities staff make alternate toilet facilities available. Contractor shall submit a forecasted timeline of work and anticipated completion date.