Task 1: Permit Procurement and Compliance This task shall consist of identifying all federal and state agency environmental compliance (permitting and consultation) activities necessary to move the project to construction and communication with Baldwin County and Spanish Fort. The exact nature of the task activities is not currently known, but anticipated information that could be requested includes assessment data, submerged aquatic vegetation surveys, habitat assessments, and information necessary to address comments received under public notice. Deliverables include: documentation of consultation with municipal, county, state and federal regulatory authorities Task 2: Compilation of Existing Data The Contractor will gather and compile existing data and surveys to characterize the project site. This may include: • Existing topographic/bathymetric surveys; • Existing submerged aquatic vegetation surveys a/o wetlands delineations; • Existing monitoring data; • Existing wave, wind and climatological data; • Existing Cultural/Historical Resources surveys and reports; and/or • Other existing data and surveys that may inform the characterization the site. Deliverables include: Compiled Surveys and Data. Task 3: Data Collection Associated with Development of Preliminary Plans (Project Engineering and Design) The Contractor will gather additional data and surveys as may be needed to further characterize the project site. This may include: • Updated topographic/bathymetric surveys; • Updated submerged aquatic vegetation surveys a/o wetlands delineations; • Geotechnical orings and/or similar data; and/or • Other existing data and surveys that may inform the characterization the site. Deliverables include: Completed Surveys, Data and Reports Task 4: Refinement of Restoration Alternatives The Contractor will develop a range restoration alternatives for the project site. These restoration alternatives may include, but are not limited to: • Placement of culverts • Placement of bridge • Combination of bridge and culverts For each alternative, the Contractor shall develop of conceptual site plan, cross sections, order of magnitude construction estimate, and/or other information needed to inform modelling and evaluation of each alternative. Deliverables include: Restoration Alternatives Task 5: Develop Preliminary Plans (30% Project Engineering and Design) This task shall consist of Engineering Services required for the preparation of a preliminary (30%) design. Activities may include survey work necessary to inform the design, as well as management of public engagement to solicit input for the design. Draft plans of alternatives shall be submitted for ADCNR review and comment, prior to moving forward with the 30% design. Deliverables include: 30% Design plans Task 6: Other related duties as requested by ADCNR. Perform other tasks requested by ADCNR that are related to the Project.