1 SP Emergency Mobilization 25 EA 2 SP Furnish and Operate Line Truck on Emergency Mobilization 80 HR 3 SP Furnish and Operate Bucket Truck on Emergency Mobilization 80 HR 4 SP Technician Labor on Emergency Mobilization 80 HR 5 SP Technician Helper on Emergency Mobilization 80 HR 6 SP $1.00 Worth of Material (Cost + 15% per $1.00) 265,000 DOL $1.15 $304,750.00 7 SP Technician (Electrician) With Vehicle 2,500 HR 8 SP Helper 2,500 HR 9 SP Remove Traffic Signal Cabinet 20 EA 10 SP Remove and Dispose of Cabinet Foundation 10 EA 11 SP Remove and Dispose of Signal Cable 8,000 LF 12 SP Remove Traffic Signal Head 250 EA 13 SP Louver 25 EA 14 SP Install Vehicle Signal Head (Single and Multiple Section) 200 EA 15 SP Install Vehicle Signal Head with Multiple Optically Programmed Sections 200 EA 16 SP Install Pedestal Mounted Signal Head 30 EA 17 SP Install Pedestal Pole with Pedestrian Signal Head 50 EA 18 SP Install Pedestrian Signal Head on Pole 50 EA 19 SP Install Messenger Cable 12,000 LF 20 SP Furnish and Install 2" PVC Conduit (Unpaved Trenching) 12,000 LF