This project consists of a comprehensive study of the city's water supply sources, system configuration and capabilities to recommend and design the appropriate method/s to remove concentrations of PFAS, to a sustainable level below the EPA’s MCL The project scope of work includes evaluating the cost-benefit of options for treatment including the implications and cost of operations and maintenance, ease of integration into current facility operations and processes, current and future benefits, and drawbacks to the placement of new equipment and/or infrastructure, and the ease and impact of future expansion and improvements as may be needed for expansion of the system. The impact and cost of operations shall include the implications and cost of disposal of associated waste/waste products. Project Limits - Existing Conditions: 777 E Rd 1 North, Chino Valley, Water Production Facility and well sites. Three supply source sites located in within Prescott Regional Airport area.