o Construction includes but not limited to: o Site Work includes but is not limited to remove, expand and replace parking lot, upgrades including ADA spaces, addition of EV parking stalls, upgrades to the path of travel (including path to public way), upgrades to site fencing and gates, landscaping upgrades throughout the campus, new playground structures and grind & overlay the playground to include new striping. Additional field improvements include new sod, new track surface and exercise stations, and new irrigation throughout the entire campus. o Beautification scope includes but is not limited to: Prep, Prime & Painting of all exterior and interior surfaces listed in the drawings per specifications. Removal, prep, and replacement of flooring at all rooms identified on the drawings, replacement of all clocks, bell and intercom equipment and installing new data network equipment, displays, and other related infrastructure. Abatement as required in reports. o Roofing scope includes but is not limited to: Roof coating as shown on drawings, removal and replacement of existing roofing with new built-up roof system by design. New gutters, roof drains, and replacement of all existing roof blocks as identified on drawings. o Expected key features include but are not limited to: o New PC Shade Structures & (2) New Play Apparatuses o New Landscape features in classroom quads, kindergarten, & in field