CLEARING AND GRUBBING 1 LS _______ _________ UNCLASSIFIED EXCAVATION 6,760 CY _______ _________ UNSUITABLE MATERIAL 68 CY _______ _________ ROCK FILL (SPECIAL) 14,210 CY _______ _________ BLADING 20 HOUR _______ _________ STRUCTURE EXCAVATION 435 CY _______ _________ STRUCTURE BACKFILL (CLASS 1) 81 CY _______ _________ FILTER MATERIAL (CLASS A) 237 CY _______ _________ TOPSOIL 159 CY _______ _________ ORGANIC FERTILIZER 85 LB _______ _________ ENVIRONMENTAL HEALTH AND SAFETY 1 LS _______ _________ AGGREGATE BASE COURSE (CLASS 2) 959 TON _______ _________ AGGREGATE BASE COURSE (CLASS 6) 431 TON _______ _________ GEOTEXTILE (DRAINAGE) (CLASS 2) 1,467 SY _______ _________ 24 INCH CORRUGATED STEEL PIPE 147 LF _______ _________ INLET TYPE 13 (5 FOOT) 3 EACH _______ _________ 6 INCH PERFORATED PIPE UNDERDRAIN 1,100 LF _______ _________ DELINEATOR (TYPE III) 6 EACH _______ _________ SANITARY FACILITY 1 EACH _______ _________ CONSTRUCTION SURVEYING 1 LS _______ _________ CONSTRUCTION SURVEYING (HOURLY) 20 HOUR