Contractor agrees to supply all containers and equipment to remove recycled oil and associated waste at designated durations from the Nine Springs Treatment Plant at 1610 Moorland Road, Madison, WI, 53713. Contractor shall follow State of Wisconsin guidelines pertaining to the disposal of these waste materials as outlined in 2009 Wisconsin Act 86. Equipment and Service Specifications 1. Shop 2 parts washer: Clean and refill with 15 gallons of solvent every 16 Weeks. 2. Maintenance Facility parts washer: Clean and refill with 20 gallons of solvent every 8 Weeks 3. Metrogro parts washer: Clean and refill with 15 gallons of solvent every 16 Weeks. 4. Disposal of sorbent materials: Estimated at fifty (50) 55-gallon drums per year. 5. Recycling of crushed waste oil filters: Estimated at two (2) 55-gallon drums per year. 6. Recycling of used oil dri/absorbent (kitty litter): Estimated at two (2) 55-gallon drums per year. 7. Disposal of waste oil: Estimated at 2,500 gallons per year. Oil must be pumped from bulk containers located at multiple locations.