Necessary Site work, excavation, erosion control measures and associated Engineering for building placement for final grading. (Soil compaction testing is required.) Provide 3/4” crush and run around building perimeter. Seed and hay all disturbed areas Form, pour and place an engineered designed foundation with associated footings, and 6” min reinforced slab Wood framed interior walls for office area. Walls will be constructed of 2x4 and 2x6 on 16” centers Walls will have 5/8” Drywall, with R-13 insulation. Ceiling will be a 2x2 acoustical with R-30 insulation above. Flooring for the shop area will be sealed concrete. Office areas will be LVP with Rubber Base. Painting – colors to be selected Specialty items to include; toilet partitions and accessories, room signage and fire extinguishers. Furnish and erect a Pre-Engineered Metal Building with a screw down Roof System (Design criteria Butler Mfg.) Commercial Overhead Doors w chain-hoist Personnel walk doors with finish hardware Roof 26 Gauge PBR Galv Roof 4” Vinyl Backed reinforced insulation roof and wall insulation Pipe Bollards (Steel)