• Installation, maintenance and removal of traffic control devices associated with the vehicular detour proposed for this project. • Installation, maintenance and removal of soil erosion and sediment control devices as shown on the plans. • Coordination with utilities including existing utility poles and overhead power, telephone and cable television lines, sewer main, water main and gas main with project limits which shall remain and be protected during construction by contractor. Maintaining the stability of all utility poles to remain throughout construction shall be the responsibility of the contractor. • Removal of existing structure in its entirety including abutments, wingwalls, parapet and footings. • Construction of new pre-cast concrete rigid frame with cast in place footings, wing walls, pylons and steel 4-bar parapets. • Construction of approximately 275 feet of roadway, including guide rail and road stripping as shown in the Construction plans. • Other incidental and necessary work shown on the Construction Plans and further described herein.