The project consists of miscellaneous structural repairs to the Pine Mountain State Resort Lodge. The rear wall facades of the (3) stairways between guest room buildings have displaced and cracked over time and will be removed and replaced. The rear split face masonry facades will have cement fiber siding reinstalled in place of the masonry. The stairs and corresponding stair landings between Units A&B and Units B&C will be replaced as moisture has rusted the load bearing landing between the lower level and upper level of these units. The replacement stairs and landings will be steel structure with concrete pan treads. The interior masonry façade in these two units will also be removed and replaced with cement fiber board. The project also consists of removing and replacing the front patio flagstone slab, following some subgrade remediation. Similar construction will occur on the walkway to the meeting room and the Unit C housekeeping slab on grade. Finally, several rusted lintels will be replaced along the rear exterior Unit C masonry wall and several handrail curbs will be repaired.