The Town would like to lease the available areas at the Site to a Developer to own, operate and maintain the System for the duration of a long-term lease agreement. The Town makes no representation as to the suitability of the Site for the System either from the standpoint of buildability, interconnection or qualification for any state or federal incentive program. The suitability of the Site for solar is the sole responsibility of the Developers, and the Town will make the final decision as part of the lease as to whether any proposed location on the Site or size of the System is acceptable to the Town. The Town’s acceptance of the Developer’s submittal with respect to the location or size of the System shall not be relied upon as a legal determination that the location or size meets any relevant or applicable federal, state or local siting regulation, law or applicable construction criteria.