Construction of a premanufactured kit-built restroom building, including but not limited to: full restroom, mechanical room, electrical, water, and sanitary connections, final electrical and plumbing trim out, and all associated finish work (sealing, caulking, signage, doors/hardware, amenities, etc). Site work includes: Site preparation; construction staking; PCC sidewalk/trail w/ detectable warning plates where shown, PCC drive and parking with integral curbs, pavement striping, PCC subbase and integral curbs, PCC beam curbs, PCC half flex court w/ striping, PCC footings, foundations and stoops as indicated on plans, along with associated earthwork and aggregate subbase work; parking signs and posts; installation of open-air shelters, and column wraps on all shelter and restroom building posts; complete basketball hoop system; stone seat blocks, boulders and flagstone; landscaping includes evergreen trees, deciduous overstory and understory trees, shrubs, perennials, seeded lawn, and native seed areas, mulch, planting soils, and watering of landscaped areas; bioretention basin with engineered soil and aggregates; sediment and erosion control measures shall be installed and maintained as shown on plans; site utilities include storm sewer, sanitary sewer, water, and electrical, including connection to new transformer; electrical work also includes drive/parking lot light poles and luminaires, restroom and shade structure lighting, and installation of security system as shown in Contract Documents with all associated conduits, cabling, and devices. Playground equipment, poured in place rubber surfacing procurement and install is by manufacturer’s preferred contractor (direct to Owner) – not in contract. Site furnishings, unless noted otherwise in Plans, are by owner. Premanufactured kit-built restroom building and open-air shelters are procured by Owner, installed by General Contractor.