SCOPE: It is the intent of the City of Columbus, Division of Sewerage and Drainage to establish a contract for the supply and installation of tonneau covers and decked drawer system onto two (2) City of Columbus supplied trucks. The installation cost will include all related components (wiring/control module/cab command hand controls/etc.). Upon delivery back to the City, truck shall have a fully operational truck with slide out drawer system and tonneau cover. Supply and install tri fold hard tonneau cover; 2 Cover shall be black; Provide estimated timeline for delivery of equipment and installation work; Equipment and workmanship shall have a warranty period of no less than 1 year starting at the time completed equipment is delivered to the City of Columbus