The project scope includes targeted structural repairs and replacements focused on restoring load-bearing components and enhancing material integrity. Rusted railings will be replaced in-kind, and concrete slabs with differential settlement will be leveled. Structural steel components, including edge beams and bar joists, will be reinforced, cleaned of corrosion, and repainted. Concrete surfaces will be repaired, with cracks sealed, and embedded steel patched and treated. Further work includes tuck-pointing of CMU joints and replacement of soil retaining barriers. Additional tasks include removal and in-kind replacement of the wood flooring, railing, edge beam, and steel connections on the exterior cantilever walkway. The roof will also be replaced in-kind. Flagstone walkway work involves removing, cleaning, replacing, and regrouting stones, while the flagstone wall will have cracked grout joints replaced and tuck-pointed. The flagstone wall north of the stairs will be demolished carefully to preserve stones, then rebuilt to match the existing wall.