1. Site Assessment a. The existing site is to be assessed at its current condition and recommendations should be put in writing. This design should keep in mind that it is a training facility and although everything will be staged, the safety of the City’s Police Officers is of the most importance. b. Utility Infrastructure shall not be considered for this proposal. c. Design concepts shall be recommended and put in writing. d. Renovation ideas shall be put in writing. 2. Provide a Scope of Project a. Provide project objectives b. Restrictions c. Timelines d. Goals/Expectations 3. Timeline a. Provide timeline for design b. Provide timeline for bidding c. Provide timeline for construction 4. General Cost Estimate a. PS&E b. Structural Design 5. Deliverables a. Plans b. Specifications (City to Provide Front End Boiler Plate. i.e. General Conditions, Contracts, etc.) The consultant is expected to put together a Specification Package, including Technical Specifications. c. Estimate d. Bidding Addendums e. RFI Reviews f. Submittal Reviews g. Provide ASI’s as needed h. Attend Meetings (Pre-Construction and during Construction as needed)