Contractor shall comply with the duties and powers of CMAR in accordance with Nevada Revised Statutes (“NRS”) Chapter 338 and Nevada Administrative Code (“NAC”) Chapter 338, including NRS §338.16985. Contractor shall make all submissions required by NRS Chapter 338 and NAC Chapter 338. Contractor shall organize and manage regularly scheduled meetings to apprise UNLV and its architect of the progress of the Project and to discuss any issues with constructability, construction cost, scheduling or any other related matter. Contractor shall provide UNLV with Contractor’s proposed site use plan, including construction staging, operations, and parking that affects the site/adjacent sites or UNLV’s use of the site/adjacent site in any way. Contractor shall develop proposed schedules and prepare construction cost models/estimates. Schedules and cost estimates shall be updated as the Project design is further developed (at a minimum upon completion of the schematic design, design development and fifty (50%) of the construction documents).