The scope of work includes removing all dirt and debris from the pipes and within the adjacent drainage structures. All large materials including tree logs, boulders or any other foreign materials shall be removed. The contractor is responsible for disposing all removed materials and debris properly. Contractor shall provide traffic control during the cleaning operations. Contractor shall provide the CCTV videos to the City, after which the City will review and determine which pipes will be lined with ultraviolet cured CIPP per GDOT Supplemental Specification Section 561. Approved UV light systems shall have the ability to record specific parameters during the curing process to ensure the liner is properly cured. The recording parameters include: • Project name • Line section • Date and time • Curing speed • Light source working & wattage • Inner air pressure • Inner temperatures • Length of liner