1 MOBILIZATION AND PROJECT CLOSEOUT 1 LS 2 CLEARING AND GRUBBING 1 LS 3 REMOVE PIPE 25 LF 4 REMOVE SIGN 5 EA 5 REMOVE CONCRETE SIDEWALK 6,800 SF 6 REMOVE FENCE 500 LF 7 REMOVE TIMBER RAIL 100 LF 8 REMOVE DRAINAGE STRUCTURE 2 EA 9 REMOVE BASKETBALL HOOP 2 EA 10 REMOVE GRANITE STONE CURB 270 LF 11 RELOCATE PAVILION 1 LS 12 CUT BITUMINOUS CONCRETE PAVEMENT 475 LF 13 MILL BITUMINOUS CONCRETE PAVEMENT 530 SY 14 EARTH EXCAVATION 900 CY 15 FORMATION OF SUBGRADE 550 SY 16 GRANULAR FILL 100 CY 17 PROCESSED AGGREGATE BASE 100 CY 18 HMA S0.5 190 TON 19 HMA S1.0 100 TON 20 ASPHALT ADJUSTMENT COST 1 EST $5,000.00 21 PERMANENT PAVEMENT REPAIR 180 SY 22 BITUMINOUS CONCRETE DRIVEWAY 110 SY 23 5" CONCRETE SIDEWALK 7,300 SF 24 5" CONCRETE SIDEWALK (COLORED) 2,160 SF 25 6" REINFORCED CONCRETE SIDEWALK 2,550 SF