The work to be performed under Contract No. P200.670, which is expected to be awarded at the Authority’s January 2025 Commission Meeting, shall consist of rehabilitation of five (5) existing culverts. Culvert MP 164.1 (existing 106” W x 73” H multi-plate Corrugated Metal Arch Pipe (CMAP) arch lined with bituminous protective coating conveying Delford Brook under GSP NB and SB), Culvert MP 164.4 (60” Corrugated Metal Pipe (CMP) lined with bituminous protective coating conveying stormwater runoff from Parkway NB, SB the grass median, interchange 165 SB and portions of adjacent commercial and residential properties discharging into a tributary to sprout brook), Culvert MP 165.6 (existing 106” W x 73” H two multi-plate Corrugated Metal Arch Pipe (CMAP) lined with bituminous protective coating conveying a tributary to Soldier Brook under GSP NB and SB), Culvert MP 170.85N and MP 170.85S (existing 106” W x 73” H multi-plate Corrugated Metal Arch Pipe (CMAP) arch lined with bituminous protective coating conveying Bear Brook under GSP NB, James Gandolfini Service area, and GSP SB).