The Work to be performed under this Contract consists of furnishing all facilities, tools, equipment, materials, supplies, and manufactured articles, and furnishing all labor, transportation, and services including fuel, power, water, essential communications, permits, and performing all Work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work will provide the next reach of a parallel conveyance facility to the District’s Jordan Aqueduct Reach 2 in order to meet future water demands within the District’s service area. The Work of this Contract generally includes the construction of the Southwest Aqueduct Reach 2 (SWA-2) from 13400 South in Riverton City to 11800 South in South Jordan City. The SWA-2 Project includes approximately 10,550 feet of new 66-inch diameter welded steel pipe including two trenchless crossings with casings, six air valve structures, one drain vault structure, two minor drains and modifications to the existing 12600 South - Jordan Aqueduct Reach 2 Vault. The Work also includes construction of an addition to the existing 11400 South Jordan Aqueduct Double Turnout Structure for installation of a new 78-inch isolation valve on the Jordan Aqueduct. Project work also includes cathodic protection and instrumentation at several locations. The Work is primarily located along 3200 West between 13400 South and 11800 South and includes connections to existing SWA-2 at both ends.