Scope of Services: Vendors will furnish all manufacture specs for each generator that will be located at the three different locations. The vendor should also present electrical specs on each of the three locations and what will be required. Each section of the job must meet all current standards with the scope of work, and completed by the deadline set by the contractor. Wilcox County EMA is asking for two facility bid meetings showing all attending contractors the location of the generator and electrical outcome from the project. Only one meeting is needed per contractor. The following three locations of each generator plays a critical role in the scope of work for GPS coordinates. Wilcox County EMA will organize the fuel tank along with the fuel tank local supplier. The tanks will be installed at the contractor’s request. Please see the following information below: Wilcox County Sheriff Office/Jail o 40 KW Fixed Generator (Propane) o Generator Coordinates (31.992718, -83.305936) o Running Load: 28 o Starting Load: 28 o Generator Voltage: 120/240 o THREE PAHSE o Concrete Pad Dimension: 100” L x 58.5” W x 4” D Wilcox County Courthouse o 80KW Fixed Generator (Propane) o Generator Coordinates: (31.992686, -83.306397) o Running Load: 56 o Starting Load: 56 o Generator Voltage: 120/240 o THREE PHASE o Concrete Pad Dimensions: 117” L x 61” W x 4” D W.N. NEWT Hudson Agricultural Center o 45KW Fixed Generator (Propane) o Generator Coordinates: (31.944064, -83.4324) o Running Load: 200A Service o Starting Load: 200A Service o Generator Voltage: 120/240 o SINGLE PHASE o Concrete Pad Dimensions: 100” L x 58.5” W x 4” D Scope of Services Part II: Each Generator should match the manufacturing specs of a (CUMMINGS Generator). You or your company is allowed to bid another brand with equal or greater quality which should include the following information about the generator (Manufacturing Specs). The scope of service should also include the following areas when bidding on the Generator Proposal. Shipping and Installation Generator Concrete Pads for each of the three generators. Facility transfer switch and all electrical connections for the generator/facility.