Bridge Group 95 – Route 4/I-95 Interchange and Route 403 Ramps project overview. First the installation of two new highway ramps to complete the movements between I-95 and RI-4. One ramp will use a new bridge to link RI-4 North to I-95 South, and the other will link I-95 North to RI-4 South. Changes include a small portion of I-95 will be shifted south, and the existing ramp from RI-2 North to I-95 South will be removed. Intersection and ramp improvements will also be installed to allow a single ramp to carry traffic to I-95 South from RI-2 in both directions. Also, the project includes construction of the new Quonset Connector Ramps, three ramps along RI-403 in North Kingstown to connect the main portion of QBP to the West Davisville District via limited-access highway.