202.7 REMOVAL OF GUARDRAIL LF 6,525.00 203.5561 EAGRT PLATFORM PREFERRED U 19.00 206.1 COMMON STRUCTURE EXCAVATION CY 26.00 304.301 CRUSHED GRAVEL CY 13.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 710.50 403.11022 HBP-3/4" BINDER MIX, MACHINE METHOD, QC/QA TIER 2 TON 4,351.00 403.11942 HBP-1/2" SURFACE MIX, MACHINE METHOD, HIGH STRENGTH, QC/QA TIER 2 TON 12,681.00 403.11952 HBP-3/8" SURFACE MIX, MACHINE METHOD, HIGH STRENGTH, QC/QA TIER 2 TON 83.00 403.12 HBP-HAND METHOD TON 280.00 403.16 PAVEMENT JOINT ADHESIVE LF 130,838.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 17,246.00 410.22 ASPHALT EMULSION FOR TACK COAT GAL 6,660.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 215.00 417. COLD PLANING BITUMINOUS SURFACES SY 41,772.00