The Project involves 4 locations, and each location consists generally of the following major items: Oxford Road: Furnishing all labor, materials, equipment and performing all work necessary and incidental to the installation of 50 LF of storm pipe, 3 catch basins and castings, 3 flared end sections and concrete pipe collars, 2650 LF of concrete curb & gutter, 1650 SY of 4” concrete sidewalk, 1060 LF of 42” safety railing, 4 concrete curb ramps, 3 sanitary sewer manhole adjustments and watertight castings, 500 SY existing pavement removal, 2600 SY full depth pavement saw cut, tree removal, erosion control, traffic control and setting up detour, and other pertinent items including seeding and restoration. Plainview Avenue and Vale Street: Furnishing all labor, materials, equipment and performing all work necessary and incidental to the installation of 1800 SY of 4” concrete sidewalk, 535 SY of 6” concrete sidewalk, 40 LF of concrete curb & gutter, 250 SY of concrete for driveway aprons, 9 concrete curb ramps, erosion control, traffic control and setting up detour, and other pertinent items including seeding and restoration.