1510-02-31: Perpetuation project proposed to repair the concrete pavement of approximately 9.4 miles of USH 10 from Apple Tree Lane to Old STH 49 Westbound, in the Towns of Lind, Weyauwega, and Fremont and the City of Waupaca in Waupaca County. Improvements include repairing concrete joints on the mainline, ramps, turn lanes and intersections. Additional work includes replacing HMA shoulders, milling and overlaying side road intersections with USH 10, repairing joints between ramps and side roads, evaluating curb ramps and guardrails, and repairing/replacing the concrete approach slabs at structure B-68-0084 over STH 110/CTH X. 1510-02-33: Perpetuation project to repair the concrete pavement of approximately 6.9 centerline miles of USH 10 from STH 49 to the Winnebago County Line in the Town of Fremont in Waupaca County. Improvements include repairing concrete joints on the mainline, ramps, turn lanes and intersections. Additional work includes replacing HMA shoulders, milling and overlaying side road intersections with USH 10, repairing joints between ramps and side roads, evaluating curb ramps and guardrails, and repairing/replacing the concrete approach slabs at structures B-68-0092, B-68-0094, B-68-0096, B-68-0089, B-68-0099, B-68-0110.