UConn Health (UCH) will be making improvements and paving portions of surface lots L1 and A5 at the main campus of UCH in Farmington, CT. The existing pavement has reached its end of life and will be removed and replaced. During construction other improvements to the lots include installation of underdrains, replacement of failing catch basin tops and pavement markings. Lot A5 is approximately 3,500 sf that will be milled 3” and paved with new 2” base course and 1.5” wear course. Lot L1 is approximately 4,500 sf of pavement removal, removal and replacement of base material and will be paved with 2” base course and 1.5” wearing course. Work in the two lots cannot occur at the same time. One lot will be completed before the second lot can be started to minimize the amount of parking space lost to construction activities. This work will be completed over the 2025 Summer when the campus is the quietest.