Storm Water Pollution Prevention 1 LS - Lump Sum work includes the development of a plan, application with the city (with proof of a NOI filed with the State), and the implementation and maintenance of best management practices (BMPs); Clearing and Grubbing 1 LS - Lump Sum Work shall include clearing of vegetation, noxious weed removal, tree removal, tree trimming, old fence removal, debris removal, and items identified on the site preparation plan (LS100) in the referenced specifications, and other miscellaneous items requiring removal that are not covered in other bid items. Asphalt Removal 1,195 SF - Square Feet Work shall include the removal of existing asphalt identified on the site preparation plan (LS100), including required saw cutting. Earthwork 1 LS - Lump Sum Work shall include the required excavation and grading required for the park site as identified on the grading plans, including the removal of approximately 2’ of undocumented unconsolidated fill material under proposed hardscape surfaces per the geotechnical report. Contractor may dispose of excess clean soil onsite, as identified on sheet C-200...