US26 (Powell Blvd): SE 99th Ave – East City Limits Section of the Mt. Hood Highway (Rt. No. US26) in Portland. FAP No. S026(130). (Over $ 30,000,000). Req. approx. 4,220 ft2 temp. signs; 4 ea seq. arr. signs; 4 ea PCMS; 54,000 flag.; 6 ea flag. sta. light.; 1,200 ea TCS; 4 ea AFAD; 245,200 ft temp strip.; 5 ea temp. flash. beac.; 6 ea temp. traf. sig.; 3,140 ft PCD; 58 ea temp. curb ramps; 1,600 ft2 temp. walks; temp. drain. fac.; 12,809 ft temp. fence; 6.35 acre temp. mulch.; 6,900 yd2 matting; 21,035 yd2 comp. eros. blnkt.; 198 ea ch. dam; ESCM; 20 ea const. entr.; 2,571 ft sed. fence; 439 ea inlet prot.; 10,171 ft sed. bar.; 21 ea decom. udrgrd. ctrl. sys.; 20,988 yd3 contam. soil rem.; const. surv. wrk.; 19,336 yd3 exc.; 2,710 yd2 sub. stab.; 27,102 yd2 geot.; 50 yd3 bldr. exc.; 19,357 ft vid. insp.; 143 ft drain pipe; 177,130 ft st. swr. pipe; 55 ft PVC pipe; 22,948 ft DI pipe; 133 ft tr. drain; 111 ea conc. M.H.; 315 conc. inlets; 878 ft drain. curbs; 258 ea adj. boxes; 16 ea con. to extg. str.; 28 ea adj. inlets; 98 ea adj. M.H.; 9,865 yd2 tr. resurf.; 75 ea drywell; 74 ea drywell cap. test; 80 ea str. clean.; 1,371 ft pipe clean.; 2,091 ft2 CIP retain. wall; 1,016 ft2 prefab. retain. wall; 22,761 ft2 sound wall; 59,655 yd2 CPPR; 43,675 ton aggr. base; 58 ton emuls. asph. tk. ct.; 34,721 ton ACP (966 ton PG 64-22; 1,250 ton PG 70- 22ER); 17,300 ft crk. seal.; 2,500 yd2 ACP rep.; 190 ea asph. appr.; 9,108 ft2 apsh. sl. pav.; 39,377 conc. curbs; 10,374 ft2 conc. island; 110,553 ft2 conc. drvwy.; 264,608 ft2 conc. walks; 8,001 ft2 pat. conc. surf.; 17 yd3 conc. stairs; 199 ea curb ramps; 5 ea conc. bus pads; 6,900 ft2 trunc. domes; 13,615 ft2 detect. guide strips; 53 ea conc. bike ramps; 450 ft cab. barr.; 23 ea boll.; 105,152 ft thermo. striping; 16 ea xwalk. clos. sup.; 2.42 yd3 conc. in sign sup.; 6,226 lb st. in sign sup.; 2,128 ft2 signs; 272 ft sig. dr. shft.; lumin., lamps, & ball.; light. poles & arms; telecom. mtl.; telecom. install.; telecom. splic. & test.; 6 ea traf. sig. install.; 10 ea flash. beac. install.; 8.35 acre weed ctrl.; 8.35 acre temp. seeding; 8.35 acre seeding; 8.35 acre fert.; 3 ea soil test.; 5,290 yd3 topsoil; 520 yd3 bark mulch; 1,416 ft root barr.; 858 ft fence; 204 ft mtl. hdrl.; 5 ea mailbox sup.; root prun.; 30 ea mailbox clus.; 421 yd3 tr. exc.; 24 ea hyd. assem.; 7 ea mov. extg. hyd.; 6,191 ft wtr. serv. line; 196 ea wtr. mtr. assem. Completion Time: June 28, 2029. Classes of Work: A) Earthwork and Drainage, or B) the combination of 1) Asphalt Concrete Paving & 2) Miscellaneous Highway Appurtenances.