Specifications include, but are not limited to: SRPC is soliciting proposals from Qualified Environmental Professionals (QEPs) with proven expertise in the implementation of watershed management plans to provide technical services; The QEP will work under the direction of SRPC staff and in close collaboration with the Sunrise Lake Watershed Advisory Committee and its partners to develop designs, cost-estimates, and operation and maintenance plans for structure BMPs; obtain state permits and an approved NHDES site specific project plan; provide construction oversight; document pollutant load reduction estimates; and participate in project team meetings. Complete project engineering, design, permitting, and construction oversight, develop Operation and Maintenance (O&M) agreements, Site-Specific Project Plan (SSPP), and pollutant load reduction documentation. Task 3: Develop Designs, Cost-Estimates, and Permits The consultant, in coordination with SRPC and project partners, will develop designs, cost-estimates, and permits for the following: o BMP 1: Hampshire Shores Beach Raingarden Installation: This system will collect stormwater runoff from Shore Drive and minimize flow into the beach and the lake. o BMP 2: Lake Shore Road Culvert Replacement Project: The new culvert will adequately convey flow and reduce erosion at the beach due to broken and outdated piping that results in significant beach gullying and sediment loading to the lake.