Assess the current condition of the SCADA systems including: Water treatment plant, water pump stations, storage reservoirs; Water Resource Recovery Facility (WRRF, treatment plant), sewer pump stations, and effluent export system; SCADA system’s network architecture, cyber security posture, telemetry equipment, control equipment, control software and control programming standards. Effectively leverage existing data, previous studies, field investigations, collaborative workshops and reports. Collaborate with IVGID staff to define current SCADA issues and improvement needs. Identify and prioritize SCADA capital improvement needs. Analyze the information to effectively develop recommendations for SCADA improved design, programming standards and implementation. Provide an engineer’s estimate for all SCADA capital improvement needs and identify potential funding sources. Evaluate the use of technology and opportunities to achieve additional operational efficiencies, enhanced security, and potential cost savings. Produce and deliver a detailed SCADA Master Plan.