A. Preparation of Project concepts, alternatives, and reports: 1. Development/Verification of Project Logical Termini. 2. Define Concept. 3. Review Environmentally Sensitive Areas (ESAs). B. Preparation of public hearing and/or public information meeting displays and materials: 1. Research property boundaries. 2. Research property owner names. 3. Public Involvement Activities. C. Preparation of mapping and property database including, but not limited to the following: 1. Aerial photography. 2. Field survey. 3. Photogrammetric mapping. 4. Cartography. 5. Digital Terrain Models (DTM). 6. Location of utilities. 7. Production of existing Right-of-Way (ROW) and property line map and processing of field enhancements for map models. D. Hydrologic and hydraulic analysis and design of hydraulic systems: E. Development of Environmental documents. F. Preliminary Roadway design and plans: 1. Constructability review. 2. Establish Design data. G. Preliminary Bridge design and plans: 1. Research existing bridge. 2. Develop a Preliminary layout.