The City of Bowling Green, KY Parks & Recreation Department is soliciting bids for the purchase and installation of a 550KW diesel generator to back up the existing 3 Phase, 480 Volt, 1200 amp service for the F.O. Moxley Community Center. The new generator shall have a 48-hour fuel tank and a NEMA 4 enclosure, vibration isolated. The automatic transfer switch shall be 1200 amp rated. This contract shall include factory test, start up, field test, operation and maintenance training with the Parks & Recreation Maintenance staff. Installation shall include all work associated with the new generator installation. Contractors shall excavate and install a new 6-inch concrete pad. Conduit shall be ran underground. Contractors may perform walk-throughs to take measurements. All conduit and wiring associated with tying into existing 1200-amp panel shall be part of this project. A battery charger and block heater shall also be installed in the new generator. Contractors shall be responsible for all related permit and inspection fees. Contractors shall also be responsible for full startup, including a power transfer after hours and shut down.