1.1 SCOPE Furnish all labor, equipment, appliances, and materials required or necessary to clean up and restore the site after the construction is completed. 1.2 REQUIREMENTS A. During the progress of the project, keep the work and the adjacent areas affected thereby in a neat and orderly condition. Remove all rubbish, surplus materials, and unused construction equipment. Repair all damage so that the public and property owners will be inconvenienced as little as possible. B. Provide onsite containers for the collection of waste materials, debris, and rubbish and empty such containers in a legal manner when they become full. C. Where material or debris has been deposited in watercourses, ditches, gutters, drains, or catch-basins as a result of the CONTRACTOR's operations, such material or debris shall be entirely removed and satisfactorily disposed of during the progress of the work, and the ditches, channels, drains, etc., shall be kept clean and open at all times. D. Before the completion of the project, unless otherwise especially directed or permitted in writing: 1. Tear down and remove all temporary buildings and structures; 2. Remove all temporary works, tools, and machinery, or other construction equipment furnished; 3. Remove all rubbish from any grounds occupied; and 4. Leave the roads, all parts of the premises, and adjacent property affected by construction operations, in a neat and satisfactory condition. E. Restore or replace any public or private property damaged by construction work, equipment, or employees, to a condition at least equal to that existing immediately prior to the beginning of the operations. To this end, the CONTRACTOR shall restore all highway, roadside, and landscaping work within any right-of-way, platted or prescriptive. Acceptable materials, equipment, and methods shall be used for such restoration. F. Thoroughly clean all materials and equipment installed and on completion of the work, deliver the facilities undamaged and in fresh and new-appearing condition. G. It is the intent of the Specifications to place the responsibility on the CONTRACTOR to restore to their original condition all items disturbed, destroyed, or damaged during construction. Particular attention will be placed on restoration of canals to equal or better condition than prior to construction.