This project includes renovations to the existing lab and classroom spaces to provide new nursing skills labs, a nursing simulation lab, an EMS simulation lab, and an updated nursing aide lab. The renovation will include the replacement of the existing floors in the renovated space and connecting corridor with luxury vinyl tile flooring. The doors and frames for each of the renovated rooms will be enlarged to accommodate the movement of hospital beds between the renovated spaces. New casework consisting of laminate faced wood with solid surface counters will be provided to meet the storage needs in each of the classrooms. New acoustical ceiling tile systems will be provided in each of the renovated labs as well as the connecting corridor. New walls will be a gypsum metal stud system and miscellaneous CMU work will be provided as needed for the modification of doorways and miscellaneous masonry repairs. All new and existing walls within the renovated spaces and connecting corridor will receive a new paint finish.