This Subcontractor will provide a proposal for the turn key system included furnish and installation of a complete Pneumatic Tube system. In accordance with design outlined in the contract documents. This Proposal is to include and be responsible for the techniques, means & methods, design & coordination assistance, used to safely furnish and install the Pneumatic Tube system for this scope of work. All materials and equipment are the responsibility of this Subcontractor to form and create a complete Pneumatic Tube system including all engineering, equipment, supports, inserts, drilling, fasteners, attachments, etc. necessary to provide a finished system. This Subcontractor shall provide the job with reliable equipment. Time lost due to inspections, breakdowns, waiting on materials, or broken/damaged equipment will be made up after normal work hours, or on weekends at the Subcontractor’s expense. This Subcontractor has studied the contract documents with the logistics plan and shall supply the job with the proper equipment to effectively furnish and install the Pneumatic Tube System. This includes but is not limited to offsite building and storage space, material, construction equipment, moving equipment, installation equipment.