BASIC SCOPE THE BASIC SCOPE OF WORK FOR THIS PROJECT INCLUDES THE COMPLETE, CAREFUL SELECTIVE DEMOLITION OF THE EXITING METAL ROOF SYSTEM DOWN TO THE STRUCTURAL PURLINS. INSTALLATION OF A NEW PRE-FINISHED STEEL STANDING SEAM ROOF SYSTEM AND METAL GUTTERS AND DOWNSPOUTS DRAINAGE TO GRADE ARE ALSO INCLUDED IN THE BASIC PROJECT SCOPE.; ALTERNATE #1 (ALT 1): SHALL CONSISTS OF THE CAREFUL SELECTIVE DEMOLITION OF THE EXTERIOR CANOPY COVERING, ITS STRUCTURE ATTACHED, METAL COLUMNS, AND COLUMN BASES. THIS SCOPE SHALL ALSO INCLUDE REPAIRS TO THE MEAL WALL PANELS WHERE REQUIRED AT STRUCTURAL FRAMING AND PATCH REPAIR TO THE CONCRETE BASE WHERE STRUCTURAL STEEL COLUMNS ARE REMOVED. INSTALLATION OF A NEW PRE-FINISHED STEEL STANDING SEAM ROOF SYSTEM AND METAL GUTTERS AND DOWNSPOUTS DRAINAGE TO GRADE ARE ALSO INCLUDED IN THE BASIC PROJECT SCOPE; ALTERNATE #2 (ALT 2): SHALL CONSISTS OF REBUILDING THE STEEL CANOPY AND RECONSTRUCTING ITS STRUCTURAL STEEL FRAMING, SOME EXCAVATION AND NEW CONSTRUCTION OF FOUNDATION BASES FOR NEW INSTALLATION OF STRUCTURAL STEEL COLUMNS AND FRAMING OF THE CANOPY. A NEW PRE-FINISHED METAL STANDING SEAM ROOF FOR THE PRE-ENGINEERED BUILDING AND CANOPY WITH NEW PREFINISHED METAL GUTTERS AND DOWNSPOUTS DRAINING TO GRADE ARE ALSO TO BE INSTALLED. ALL EXTERIOR-EXPOSED STRUCTURAL STEEL IS TO BE PREPARED FOR AND FINISHED WITH A HIGH-PERFORMANCE ARCHITECTURAL COATING. THE NEW PRE-FINISHED METAL STANDING SEAM ROOF SYSTEM IS DESIGNED TO BE CONSTRUCTED TO MEET CURRENT CODE FOR STRUCTURAL AND WIND LOADS AND UPLIFT REQUIREMENTS.