• Construct new Holly Ridge Pump Station at the Existing Holly Ridge Wastewater Treatment Plant site. New pump station to include two (2) new submersible pumps (and room for a third), monorail pump lift crane under roof, back-up diesel pump, emergency generator, electrical building with electrical and telemetry equipment, and associated piping, appurtenances, roads, and site work. • Construct new 12-inch diameter force main from new Holly Ridge Pump Station to new Summerhouse Pump Station as shown on the Drawings. • Construct new Summerhouse Pump Station at the existing Summerhouse Water Reclamation Facility site. New pump station to include submersible wet well with three submersible pumps (and room for a fourth), valve vault, monorail pump lift crane under roof, back-up diesel pump, emergency generator, electrical building with electrical and telemetry equipment, and associated piping, appurtenances, roads, and site work. • Replace existing Reclaimed Water Pumps with new Reclaimed Water Pumps and associated equipment. • Construct new 18-inch diameter forcemain from the new Summerhouse Pump Station to the temporary plug location as shown on the Drawings. • Construct new 8-inch diameter treated effluent force main from the existing Summerhouse Reclaimed Pump Station to the existing Holly Ridge Sprayfield Storage Pond.