The work generally consists of mobilization, installation of traffic control measures, light cleaning and closed-circuit television inspection of approximately 2,767 linear feet of 8-inch diameter ACP sanitary sewer, the possibility of heavy cleaning of 8-inch diameter ACP sanitary sewer, sealing of sanitary sewer joints and defects, air testing and sealing of house connections, and/or spot lining of sanitary sewer defects, which are all if and where directed items; installation of approximately 1,921 linear feet of cured-in-place pipe (CIPP) liner within the existing 8-inch diameter ACP sanitary sewer host pipe with watertight connections within the existing sanitary manholes, reinstating all service laterals, all while maintaining gravity wastewater flows; post-liner installation inspection; rehabilitation of the existing “Medford” utility easement sanitary manholes by lining, temporary access measures; restoration of disturbed areas and demobilization.