The summary of the design work that has been done on the Ft Lyon Emergency Generator are as follows. Building 4: - Demo Existing 208V and 480V transformers. - Add 500KVA, 480V transformer and connect to a 1200A service rated ATS using existing pad. - Add a 750KVA generator and connect it to the ATS. - From the ATS, feed to the existing 600A and reuse existing equipment downstream. - Also from the ATS, feed to a 600A disconnect followed by a 300KVA (480V to 208V) step down transformer on the existing pad. - Feed 300KVA transformer to existing panel ‘MSB-4L’. Building 6: - Reuse existing 500KVA, 480V transformer and connect to a 1200A service rated ATS. - Reuse existing generator and connect it to the ATS. - Connect ATS to 1200A disconnect - Connect 1200A disconnect to existing 1200A MCB - Demo existing ATS and add a new feeder from MCB to existing panel ‘EMD-6’ Building 8: - Add 1200A service rated ATS. - Add a 750KVA generator and feed to the ATS. - Feed ATS to an 800A existing panel “MDB-8H” - Also from the ATS, feed to a 400A disconnect feeding a 300KVA (480V to 208V) step down transformer. - Feed 300KVA transformer to existing panel ‘MDB-4L’...