1. Overview of project site location (including panoramic and aerial site photos) and description of where array is to be sited. 2. System size (kW AC and kW DC), and generating facility equipment, including manufacturer and model (if applicable) of inverters, panels, racking, production meter and monitoring software. 3. Solar PV system schematic (including one-line drawing =with an attached copy of any relevant engineering or feasibility studies. 4. Solar Site Survey, including a solar shading analysis and estimated annual production; a minimum of 80% optimal insolation is required. Please attach a copy of the Solar Site Survey. 5. Projected kilowatt-hours (kWh) to be generated (annual and lifetime) and the assumptions (e.g., capacity factor) used for the estimate. 6. Project timeline, including start date, key milestones in project progress (e.g., design, permitting, construction, start-up, commissioning), and expected interconnection date. 7. List of permits and approvals required and status of such permits and approvals, including any lease or site-control arrangements with property owners. Please attach a copy of any applicable lease agreement or any other documents that demonstrate site control. 8. Description of the Town/City approval process for this project including timelines and important dates. 9. Describe the status of the interconnection review process. Provide the date on which each of the following steps occurred or is anticipated to occur: i) submittal of Pre-Application, ii) submittal of Interconnection Request, iii) execution of System Impact Study Agreements, iv) execution of Interconnection Agreement. 10. If a roof-mounted system, demonstrate that a structural analysis has been completed. 11. Describe project ownership structure, identify system owner, identify site owner, if different, including names of all project owners and project site ownership and/or leasing structure, and describe any power purchase agreement (PPA), if applicable. Please attach a copy of any applicable PPA. Please include letter of support from the site owner, if different from the system owner(s) and/or project owner(s). 12. Describe assignments and roles of individual key project personnel, listing the project developer, solar installation company, NH licensed electrician, and any other project personnel, including group net metering registration and management. 13. Describe operations and maintenance plan for the system, including shortterm and long-term system operation, maintenance, and monitoring arrangements, and estimated project lifespan, including any associated costs. 14. Describe the Labor and Product Warranties; note that a minimum of five years’ labor warranty is required. Projects must include a long-term plan for one full replacement of project inverters.