Task 1: Survey, Geotech, Permitting, Environmental Assessments, Engineering Design, Bidding/Execution of Construction Contract Award Schematic: Engineer will conduct all preliminary surveying, Geotech, environmental assessments, and other services and secure all necessary permits for the project. Engineer will coordinate with all relevant local, state and federal agencies to secure all necessary approvals. Engineer will provide schematic plans and specifications for review by the City to a level sufficient with preliminary costing. Engineer will develop detailed plan drawings and typical site details will be developed. Design Development: Engineer will proceed following the City’s approval of Final Schematic Designs. Detailed plan drawings and typical site details will be developed. The final deliverables for Design Development will include plans, prototypical details and finishes, enlargements, conceptual grading plans, and budget analysis. Permitting: Engineer will conduct environmental assessments and secure all necessary permits for the project which may include, but are not limited to, environmental impact studies. Consultant will coordinate with all relevant local, state and federal agencies to secure all necessary approvals Construction Documents: Engineer will develop construction documents. The detailed plan drawings and details will be developed that are suitable for bidding and construction of the project. The documents will include both detailed and performances plan specifications for design elements to give the contractor the maximum ability to provide solutions that meet the design intent within budget. Engineer will refine construction plans at 50% and 90% to bring project within budget. Deliverables will include all plans, elevations, details and specifications required to permit, bid and construct the project including civil plans and construction plans. Project will be awarded in accordance with all applicable federal grant and local and state procurement procedures. The final deliverables will include three (3) fully executed construction contracts.