Review available plans and specifications for the Resource Recovery Facility and Jet Turbine Facility to identify non-structural installed machinery and equipment that may be safely removed and/or disassembled for resale or scrap by the Authority’s Equipment Brokerage Contractor or Metals Recycling Contractor; Review the Authority’s draft “Closure Plan” for the Resource Recovery Facility, and associated correspondence, to ensure that the resale or scrapping of installed machinery and equipment is conducted in accordance therewith; Review findings of the Authority’s Hazardous Building Materials Survey for purposes of excluding metals not suitable for recycling from further consideration; Physically inspect the Resource Recovery Facility, Jet Turbine Facility and Site to confirm non-structural installed machinery and equipment that may be safely removed and/or disassembled for resale or scrap by the Authority’s Equipment Brokerage Contractor or Metals Recycling Contractor; Coordinate with the Authority and its Equipment Brokerage Contractor in the designation of machinery and equipment intended for resale or scrapping