RANDOM RIPRAP CLASS II 5 CY,AS BUILT 1 LS,MAINT AND RESTORATION OF HAUL ROADS 1 LS,SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 1848 LF,EXCAVATION SPECIAL 20 CY,CONCRETE CURB RAMP WALK 2220 SF,4" BROKEN LINE PREFORM TAPE GROUND IN (WR) 200 LF,SALVAGE METAL APRON 1 EACH,REMOVE CURB AND GUTTER 1060 LF,REMOVE BITUMINOUS PAVEMENT 2607 SY,REMOVE BITUMINOUS WALK 828 SF,HAUL SALVAGED MATERIAL 1 LS,AGGREGATE SURFACING (CV) CLASS 1 24 CY,6" CONCRETE WALK 5875 SF,CONCRETE SILL 29 LF,TEMPORARY WALKWAY SURFACE 940 SF,SEDIMENT REMOVAL VAC TRUCK 5 HOUR,6" SOLID LINE MULTICOMPONENT GROUND IN (WR) 2185 LF,CROSSWALK PREFORM THERMOPLASTIC GROUND IN 1260 SF,PAVEMENT MARKING REMOVAL 3550 LF,SAWING CONCRETE PAVEMENT (FULL DEPTH) 67 LF,AGGREGATE BASE (CV) CLASS 5 334 CY,ADJUST FRAME AND RING CASTING 2 EACH,AUDIBLE MESSAGE DEVICE W PUSHBUTTON & LOCATOR TONE 63 UDAY,TEMPORARY SIGNAL SYSTEM B 1 SYS,SEED HIGH-TRAFFIC INSLOPE 32 LB,GEOTEXTILE FILTER TYPE 3 26 SY,PAVEMENT MARKING REMOVAL 1296 SF,REMOVE CURB 53 LF,EXCAVATION - COMMON 995 CY,FINE AGGREGATE BEDDING (CV) 5 CY,22" SPAN RC PIPE-ARCH CULVERT CLASS IVA 11 LF,ALTERNATE PEDESTRIAN ROUTE 1 LS,DELINEATOR / MARKER PANEL 4 EACH,SIGN 234 SF,STORM DRAIN INLET PROTECTION 5 EACH,CULVERT END CONTROLS 3 EACH,FERTILIZER TYPE 3 268 LB,WEED SPRAYING .5 ACRE,WEED SPRAY MIXTURE .5 GAL,GUIDE POST TYPE B 1 EACH,REMOVE CONCRETE WALK 5072 SF,DRILL AND GROUT REINF BAR (EPOXY COATED) 373 EACH,TRAFFIC CONTROL 1 LS,TEMPORARY PEDESTRIAN RAMP 6 EACH,REVISE SIGNAL SYSTEM A 1 SYS,ROLLED EROSION PREVENTION CATEGORY 20 3436 SY,MOWING 2 ACRE,SEED SOUTHERN BOULEVARD 41 LB,6" SOLID LINE PAINT (WR) 741 LF,COMMON EMBANKMENT (CV) 211 CY,HAUL AND DISPOSE OF CONTAMINATED MATERIAL 36 TON,JOINT ADHESIVE 1945 LF,CONCRETE CURB AND GUTTER 851 LF,TRUNCATED DOMES 229 SF,INSTALL SIGN 1 EACH,TRAFFIC CONTROL SIGNAL SYSTEM B 1 SYS,SITE RESTORATION 3 EACH,REMOVE SIGN 33 EACH,INSTALL METAL APRON 1 EACH,DELINEATOR / MARKER 1 EACH,REVISE SIGNAL SYSTEM C 1 SYS,SEDIMENT CONTROL LOG TYPE COMPOST 1489 LF,SUBSOILING 1 ACRE,SOIL BED PREPARATION 1 ACRE,INTERIM PAVEMENT MARKING 1 LS,6" DOTTED LINE PREFORM TAPE GROUND IN (WR) 45 LF,PAVEMENT MESSAGE PREFORM THERMOPLASTIC GROUND IN 62 SF,MOBILIZATION 1 LS,REMOVE DELINEATOR / MARKER 2 EACH,SALVAGE SIGN 1 EACH,REMOVE CHAIN LINK FENCE 40 LF,REMOVE AND REPLACE BITUMINOUS PAVEMENT 119 SF,MILL AND PATCH BITUMINOUS PAVEMENT 2793 SF,TYPE SP 12.5 WEARING COURSE MIXTURE (4,F) 375 TON,EMERGENCY VEHICLE PREEMPTION SYSTEM B 1 LS,SEEDING 1 ACRE,8" SOLID LINE PREFORM TAPE GROUND IN (WR) 643 LF