The scope of work includes the rehabilitation of the existing sewer in the vicinity of Garner Road within the City of Tuscaloosa, Alabama. The work is shown in detail on the Contract Plans but is generally described for each station as: (1) Mobilization and demobilization in accordance with Section 01 505 – Mobilization and Demobilization. (2) Remove and replace four existing air/vacuum release valves (ARVs) on the existing 20-inch force main from Lift Station 42 with 6-inch combination ARVs. (3) Remove and replace four existing ARV manholes with four new 5-foot diameter standard flat top manholes and vented covers. (4) Rehabilitate approximately 19,000 LF of 24-inch/30-inch with cured in place pipe liner. (5) Rehabilitate approximately 68 manholes. (6) Perform post-rehabilitation CCTV inspection of approximately 19,000 LF of sewer main.