This project involves two buildings and site / utility work within the Boonesborough Firing Range complex. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: Site: Provide new water line from the top of the hill to existing Restroom to supply fixtures then continue to the Live Fire facility to serve a new yard hydrant and frost-free water fountain/bottle refill station.Firing range to have new lighting and sound system. A new traffic signal system to be provided at the top and bottom of the hill and other Work indicated in the Contract Documents. Restroom: The existing facility will be completely gutted including exterior siding and roof. Interior layout will be slightly re-configured including masonry CMU work, new doors, new plumbing fixtures, new electrical and new mechanical. Exterior to receive new insulation, siding and roof and other Work indicated in the Contract Documents. Classroom / Live Fire building: At exterior remove existing siding and portion of stair, skylights and roof, patch and prep for new insulation, siding and roof. Cut in and install two new windows at upper level overlooking range. Provide new gyp ceiling at upper level with batt insulation to enclose for new HVAC at both levels and other Work indicated in the Contract Documents.