This project involves removal of the existing potable water treatment plant and concrete storage tank at Greenbo State Park in Greenup County, KY. Construction of a new water storage tank on the existing site, reconnection of the city water supply t the tank, and new SCADA controls between the remotely located city water tank fill valve, the new tank level controller, and the main SCADA communications controller located in the lodge mechanical room on the same site. Electrical power modifications include medium voltage underground feeder rework at the water tank, relocation of the existing twoway radio antenna tower adjacent to the new tank, and new 120/208 volt power and Class II control wiring at the tank site for the two-way radio repeater and SCADA controls and at the valve site for SCADA systems. Additional branch circuit and communication wiring is included inside the lodge building. Interconnection with the existing DDC building automation system for monitoring of the tank level and fill valve status will be provided by the incumbent DDC controls contractor for the lodge building